Design flood analysis of goupitan hydropower station 构皮滩水电站设计洪水分析
2.
Design flood analysis for open diversion channel closure of tgp 三峡工程明渠截流设计洪水分析
3.
Storm flood analysis for taihu lake basin during plum rain period of 1999年梅雨期太湖暴雨洪水分析
4.
The main results of the paper are as follows : ( 1 ) the flood analysis on gongboxia hydro - power in construction in 2002 其主要研究成果如下: ( 1 )公伯峡水电站2002年施工洪水分析。